Week 1: Progress

While we haven't crossed a lot off the list this week there was A LOT done! It doesn't even look like the same house and it's already hard to look back on the pictures of the "before" so I can't imagine what it will be like in a few more weeks. I will share some of the demo pictures next week.

Next week the electrical and plumbing are getting done and we are quoting out the tree removal then the following week is HVAC.... nothing exciting but important nonetheless!

Happy Friday!

Kitchen/Laundry: GUT!
  • New Cabinets
  • New Countertops
  • New Appliances
  •  Backsplash
  • Flooring
  • Add Island
  • Take down top half of wall between kitchen and den
  •  Expand doorway in laundry
  • Add pantry shelves in laundry
  •  Add upper cabinets in laundry
  • Add a dryer vent
Den:

  • Redo/build new built-ins for TV
  • Add 2 new windows on either side of door
  • New sliding glass door


Guest Bath: GUT!

  • New Tub
  • New tile surround in shower
  • New flooring
  • New vanity
  • New toilet
  • New Fixtures

Master Bath: GUT!
  • Take out extra closet in guest room to expend shower
  • Tile new shower
  • New flooring
  • New double vanity
  • New toilet
  • New Fixtures
  • Switch placement of toilet and vanity
Outside:
  • New entry porch Roof and Railings
  • Remove Trees
  • Add Gutters
Misc:
  • Paint (every square inch of the house)
  • Refinish hardwoods
  • Update Electrical
  • New HVAC
  • New closet doors throughout
  • New Front/Back Doors
DIY:
  • Remove Interior Shutters
  • Install new closet systems in bedrooms
  • Initial Landscaping
  • Install new light fixtures in house
  • Update hinges and doorknobs throughout house
  • Replace outlet covers
  • Install blinds